This project involved the supply and installation of GRP valve pit covers and safety handrails for a gas tie-in project in the Shetland Islands, delivered for NSMP / SIRGE within a remote oil and gas environment.
Project Overview
- Industry: Oil and Gas
- Location: Shetland Islands
- End Client: NSMP / SIRGE
- Project Scope: Gas tie-in works
The project required durable, load-rated access solutions suitable for installation within a remote oil and gas setting, with a focus on safe access, modularity and long-term performance.


Project Requirements
The installation required walk-on access covers capable of supporting operational loads while allowing safe access to valve pits during inspection and maintenance activities.
Key requirements included:
- Walk-on access across valve pit areas
- Defined load ratings suitable for operational use
- Modular cover sections to allow removal and access
- Integrated handrails to maintain edge protection
- Suitability for a remote, exposed environment
Installed GRP Solution
PJNC supplied and installed GRP valve pit covers and handrail systems designed to meet the site’s access and safety requirements.
Installed systems included:
- GRP valve pit covers: 135 m²
- Integrated GRP handrails
The covers were supplied in four removable sections to allow controlled access to underlying infrastructure while maintaining safe, walk-on surfaces when in place.


Technical & Design Requirements
- Walk-on GRP covers rated to 5.0 kN/m²
- Covers supplied in four removable segments
- GRP handrails rated to 0.74 kN/m
All systems were designed to integrate with the valve pit layout while maintaining compliance with site safety requirements.
Installation & Delivery
Installation was carried out in a remote location, requiring consideration of access logistics, phased delivery and efficient on-site handling.
The modular nature of the GRP components allowed installation without heavy lifting equipment, supporting safe handling and installation within the constraints of the site.


Outcome & In-Service Performance
The completed installation provides safe, load-rated access to valve pit infrastructure while maintaining edge protection and long-term durability in a challenging oil and gas environment.
The GRP systems installed are well suited to the remote location, supporting corrosion resistance and reduced maintenance requirements over the service life of the installation.
Project Gallery
Project Enquiries & Technical Discussion
If you have a similar site, process area or access requirement, PJNC can provide technical guidance based on delivered projects such as this installation in the Shetland Islands.
Our team can support early-stage design, load assessment and system suitability for access, containment and protection solutions in remote and operational environments.
Reference this project where relevant when submitting your enquiry to assist our technical team.