Hull STW – GRP Odour Control Installation

Wastewater treatment facility – new inlet works

This project involved the installation of GRP odour control covers and access systems at Hull Sewage Treatment Works as part of Yorkshire Water’s new inlet works development.

Project Overview

  • Industry: Wastewater Treatment
  • Location: Hull Sewage Treatment Works
  • End Client: Yorkshire Water
  • Project Scope: New inlet works

This project formed part of the construction of new inlet works infrastructure, requiring durable, corrosion-resistant access and containment systems suitable for long-term operation within a wastewater treatment environment.

Aerial view of GRP odour control covers installed at Hull Sewage Treatment Works inlet works.
Open inlet works channels and access areas at Hull Sewage Treatment Works prior to odour control cover installation.

Project Requirements

The installation required GRP systems capable of providing effective odour containment while allowing safe operational access across multiple process areas.

Key requirements included:

  • Walk-on and non-walk-on cover systems
  • Defined load ratings for access and maintenance
  • Integration with coarse screens, detritors and fine screening channels
  • Compliance with site safety and operational standards

Installed GRP Solution

PJNC supplied and installed a combination of GRP odour control covers and handrail systems across the inlet works.

Installed systems included:

  • GRP odour control covers: 1,100 m²
  • GRP handrail: 50 linear metres

Cover systems were provided in both walk-on and non-walk-on configurations to suit specific access and process requirements across the site.

Installed GRP odour control covers and handrail systems across inlet works at Hull Sewage Treatment Works
Installed walk-on GRP covers and handrail system providing rated access over inlet works at Hull Sewage Treatment Works.

Technical & Design Requirements

  • Walk-on covers rated to 7.5 kN/m²
  • Non-walk-on covers rated to 1.0 kN/m²
  • GRP handrail rated to 0.74 kN/m

All systems were designed to integrate with the new inlet works layout while maintaining safe access routes for inspection and maintenance.

Installation & Delivery

Installation was carried out as part of a live construction environment, requiring coordination with other trades and phased delivery across multiple process areas.

GRP systems were supplied pre-fabricated to suit site dimensions, allowing efficient installation while minimising disruption to ongoing works.

Installation of GRP odour control covers over inlet works during live construction at Hull Sewage Treatment Works.
Completed GRP odour control covers in service over inlet works at Hull Sewage Treatment Works, providing safe access and long-term containment.

Outcome & In-Service Performance

The completed installation provides effective odour containment across the inlet works while maintaining safe, clearly defined access routes for operational staff.

The GRP systems installed are compatible with the wastewater environment and support long-term durability with minimal maintenance requirements.

Project Gallery

Project Enquiries & Technical Discussion

If you have a similar site, process area or access requirement, PJNC can provide technical guidance based on delivered projects such as this installation at Hull Sewage Treatment Works.

Our team can support early-stage design, load assessment and system suitability for odour control, access and containment solutions in live wastewater environments.

Reference this project where relevant when submitting your enquiry to assist our technical team.

Name