Modular GRP enclosures for odour control at wastewater treatment facilities

PJNC designed and supplied bespoke GRP skip enclosures to provide effective odour containment over removable skips used for dry sludge collection at sewage treatment plants. The enclosures were developed to operate within corrosive wastewater environments while allowing regular skip removal and replacement.

Project Requirement

Odour control was required over removable skips used to collect dry sludge within an operational sewage treatment plant. The enclosure system needed to provide effective containment while allowing the skips to be accessed, removed and emptied as part of routine operations.

The solution also needed to accommodate varying skip sizes and plant layouts, while remaining suitable for long-term use in a corrosive outdoor environment.

The GRP Solution

A bespoke GRP skip enclosure system was developed to suit the specific requirements of wastewater treatment operations. The modular design allows the enclosure to be configured to suit different skip sizes, heights and plant arrangements.

GRP was selected as a suitable material due to its corrosion resistance and suitability for use in aggressive wastewater environments, while remaining lightweight and practical to install.

Modular GRP skip enclosures configured to suit different skip sizes at a wastewater treatment plant

Key Design & Engineering Considerations

The skip enclosures were engineered to balance odour containment, accessibility and durability within a live treatment facility.

Key design considerations included:

  • Modular configuration to suit different skip sizes and layouts
  • Allowance for skip removal and replacement during operation
  • Structural performance suitable for outdoor wastewater environments
  • Lightweight GRP construction to support efficient installation

The system can be adapted or reconfigured as site requirements change.

Fabrication & Installation

The GRP enclosure components were manufactured off site using structural GRP profiles and sections. The modular sections were supplied ready for assembly, allowing installation to be carried out efficiently on site.

The enclosure was installed in a way that maintained access for ongoing skip handling operations, minimising disruption to normal plant activity.

GRP skip enclosure components being assembled on site over a removable sludge skip at a wastewater treatment plant
GRP skip enclosure installed over a removable sludge skip providing odour containment at a wastewater treatment plant

Performance & Suitability

The completed GRP skip enclosures provide effective odour containment while remaining compatible with routine skip removal and maintenance. Their corrosion resistance and low maintenance requirements make them well suited to long-term use in wastewater treatment environments.

Discuss a Non-Standard GRP Application

If your wastewater treatment facility requires odour control solutions for removable skips or non-standard plant configurations, PJNC can provide technical guidance on a bespoke GRP enclosure system.

Share your skip dimensions, site layout and operational requirements using the form below.

Name

CONTACT US

A higher Quality of Product and Service.

PJNC Ltd work hard to ensure all products offered are to the highest standards and are able to perform even in the most extreme conditions.

Name