The following case study of a GRP Cover project illustrates what PJNC Ltd can offer potential customers.

Project Brief

 

Existing Primary Settlement Tanks require odour covers

• One tank is 52 m x 15m and 8 tanks to be covered
• GRP has been specified as alternative to aluminium


Requirement

Reservoir requires a roof!

 

reservoir

 

Initial Design Concepts

PJNC Ltd generate initial design concepts/solutions

 

ddesign

 

From the concepts, an initial structural analysis is done which generates basic input into final design

dcomplete

 

droof

 

dsupports

Final Design

Structurally verified

structureplan

Snow Load

structuresnowloa

Shop floor fabrication drawings are produced

shopfloorfabricat

fabricationitems

Production of profiles

Main profiles are produced via Pultrusion process

profileproductio

Pre-fabricated parts

Parts are fabricated from the profiles

fabricatedparts

Assembled prototype

A prototype is assembled

pjnclt7

Pre-assembled sub-assemblies

Pre-assembled sub-assemblies

preassembledpart

Start of installation

 

installation

Installation in progress

 

buildprogress

Final product installed

 

pjnclt1